Valved in pumps in this order:
Left IP2 valved out as it cleans up from being up-to-air. It is currently running at 5kV.
Turbo is currently still valved in.
Valved out turbo.
RGA scans attached:
Partial pressure of water continues to fall and currently at ~ 3e-7 A, with RGA in SEM mode. Pre-vent reference (with leak) was 1e-7 A with four IPs valved in (NEGs and CPs valved out).
Total pressure is currently 7.3 x 10-8 Torr.
Kyle increased IP2 supply voltage to 7kV late in the day. Pump pressure is still relatively high (10-7 Torr range).