Reports until 10:06, Tuesday 27 November 2018
LHO VE
chandra.romel@LIGO.ORG - posted 10:06, Tuesday 27 November 2018 (45522)
EY ready for y-arm!

IP11 valved in, plus two NEGs. Total pressure is 5.1e-8 Torr. Pre and post vent RGA scans attached.

Pre-vent scan is open to beam tube and IP11 is valved out (both NEGs valved in)

Post-vent scan represents volume being pumped by IP11 + NEG4 + NexTorr HV NEG.