thomas.shaffer@LIGO.ORG - posted 16:00, Friday 30 November 2018 (45596)
Ops Day Shift Summary

TITLE: 11/30 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY: 7.0 Magnitude earthquake from Alaska put us out for a bit, but commissioning is now back in full swing. The "Large Earthquake" button was pressed just before the EQ arrive, thanks to a SEISMON alert. The "Recover EQ" button was pressed to bring it all back. The useism is still around the 0.5um/s range and wind 0-15mph. To deal with the elevated useism, Jim is trying out a some new blend filters that are in the USEISM state of SEI_CONF, this is the current state.
LOG:

1556 Karen to MY to clean
1626 Karen leaving
1637 Vanessa to LVEA to start cleaning
1803 Kyle to LVEA to check on pumps
1818 Kyle out of LVEA and heading to MY
1833 Keita to LVEA to check on Relf DC signal
1914 Keita out
1952 Kyle back
2058 Fil, Peter to MX
2525 Fil, Peter back
2151 Dave to end stations to get card info
2202 Kyle, Gerardo, to ends, mids, and LVEA to drop off equipment
2233 Dave back

2325 Sheila, Haocun to LVEA to SQZ bay

 