Reports until 12:10, Monday 03 December 2018
LHO VE
Link
kyle.ryan@LIGO.ORG -
posted 12:10, Monday 03 December 2018
(45645)
~noon local time -> valved-in 500 L/s ion pumps at HAM1 and HAM6
Turbo pumps left valved-in (in parallel) while IPs stabilize.