(Corey, Hugh, Jim, Mitchell) The Scissors Tables (and basically the entire Seismic Isolation System) were vertically adjusted such that the Scissors Tables were set to their "mid-point" elevations. Shipping/Llot Links were installed to hold the Scissors Tables here (as we did for the H2 HAMs). The Scissors Tables were actuated manually via a rod attached to a motor underneath the Scissors Table. We needed a special key-ed tool to turn the crank and actuate the Scissors table. We will do BSC7 next time we get a chance.