3 viewports were installed on the IO septum, the fourth one will be installed at a later date.
The first contact was removed from the viewports outside of the chamber, inspected, then the o-ring set into the groove. The viewports were installed on their respective ports. Torque used 16 ft*lbs.
VP1, VP3, VP4 were the ports installed
(Mark L, Marc S, Gerardo M, John W, Douglas D)