Reports until 13:41, Wednesday 12 December 2018
H1 General
yannick.lecoeuche@LIGO.ORG - posted 13:41, Wednesday 12 December 2018 (45879)
Shift Summary - Day

TITLE: 12/12 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC

STATE of H1: Commissioning

INCOMING OPERATOR: None

SHIFT SUMMARY:

 

16:00 (8:00) Start of shift

16:15 (8:15) Peter to Optics Lab

16:29 (8:29) Karen to LVEA

17:44 (9:44) Karen to MY, EY

17:47 (9:47) Nutsinee, Terry to HAM6

17:54 (9:54) Terry back from HAM6

18:36 (10:36) Jeff to cleaning area

18:53 (10:53) Jeff back from cleaning area

19:04 (11:04) Peter out of Optics Lab

19:24 (11:24) Karen back from MY

19:52 (11:52) Sheila to LVEA -- talk to Nutsinee about noise levels

20:11 (12:11) Sheila back from LVEA

20:14 (12:14) Robert to EX -- look for electronic noise sources

20:33 (12:33) Nutsinee back from ISCT6

21:30 (13:30) Handing off control to Ed