Reports until 16:51, Friday 14 December 2018
H1 INJ (CAL, CDS, DetChar, OpsInfo)
jeffrey.kissel@LIGO.ORG - posted 16:51, Friday 14 December 2018 (45950)
PCALX PINJX Hardware Injection Filters Back ON
J. Kissel, K. Riles

Keith and Dave believe they've solved their issues with the hardware injection infrastructure, so I've been given the OK to restore the HARDWARE filter such that it passes all hardware injections through. The CW excitation path now has an open pipe to actuate PCALX and the ETM (though there's currently nothing running.)