Reports until 00:02, Tuesday 18 December 2018
LHO General
corey.gray@LIGO.ORG - posted 00:02, Tuesday 18 December 2018 (46025)
EVE Operator Summary

TITLE: 12/18 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY:

Locks started out in the ~20min range 1/4 into the shift.  Alignment was fine and able to get up to NOMINAL LOW NOISE (NLN) w/ no major issues for a few hours (but only with short locks).  But for the last 2-3hrs H1 locking degraded more and only able to stay at NLN for 1-3min at a time.  Some notes:

Leaving in the DOWN state overnight.