The end station and beam splitter OpLevs have been re-centered. The EY laser was adjusted in power to relieve the residual glitching. the power was all the way up therefore the adjustment was made down by 20mv. I hope this was for the better. Only time will tell.
Glitches have gotten worse on ETMY. I'll
rettry another 20mv reduction when I get the opportunity.