Reports until 16:00, Friday 04 January 2019
H1 General
travis.sadecki@LIGO.ORG - posted 16:00, Friday 04 January 2019 (46232)
Ops Day Shift Summary

TITLE: 01/04 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY:  Struggled most of the day to get to/past DRMI due to high microseism and wind and ALS issues.  Just getting close to NLN at the end of the shift.
LOG:

16:28 Chris clearing tumbleweeds along X arm

16:35 Ed to EY to tweak OpLev laser

17:10 Ed back

18:10 Kyle to LVEA retreiving pump carts

18:25 Kyle out

19:23 Kyle to both mid stations

20:40 Kyle back

20:44 Fil to CER mezzanine

20:55 Fil out