TITLE: 01/04 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY: Struggled most of the day to get to/past DRMI due to high microseism and wind and ALS issues. Just getting close to NLN at the end of the shift.
LOG:
16:28 Chris clearing tumbleweeds along X arm
16:35 Ed to EY to tweak OpLev laser
17:10 Ed back
18:10 Kyle to LVEA retreiving pump carts
18:25 Kyle out
19:23 Kyle to both mid stations
20:40 Kyle back
20:44 Fil to CER mezzanine
20:55 Fil out