TITLE: 01/07 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
Wind: 10mph Gusts, 6mph 5min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.49 μm/s
QUICK SUMMARY:
- H1 is not locked or locking
- the IMC is locked
- useism is climbing, there's a wind storm at the coast
- Jenne is here and we will be doing an initial alignment and attempt to lock
- one alarm:
- H0:VAC-EX_X6_PT527_MOD1_PRESS_TORR_ERROR
- it's been at 1, alarm, for about 12 days
- Vanessa is at EY cleaning, will be careful around BRS
- 15:45UTC (7:45AM) - ChrisS to MX to deliver new scaffold