Reports until 14:58, Monday 07 January 2019
H1 General
Link
cheryl.vorvick@LIGO.ORG -
posted 14:58, Monday 07 January 2019
(46264)
Morning Meeting:
VAC: WP8025
MX, close gate valves, will take more than 4 hours
SEI: Hugh/Jim
HAM1 1Hz investigation
HAM4/5/6 ISI updates
GRD: WP8027 Jonathan/TJ
Guardian Restarts
DAC WP8030 DaveB
reboot framewriters
update EPROMs for Dolphin
ALL FRONT ENDS WILL NEED TO BE REBOOTED - SDF updated would be preferable
EE: WP8029 Fil/Ed
SQZ: table top FSS fit check and documentation
ALSO: P-Cal temperature sensor
LVEA prep for O3: Bubba
move the cleanroom over HAM5/6
PEM: Robert arrives tomorrow
testing the new PZT mount on the PSL
new periscope safety shield is here, possible install
PSL: Jason
DBB commissioning
DetEng: JeffK
calibration model fix
Commissioning/ISS 2nd loop
card swapped today, possible further diagnostics during Maintenance tomorrow
TCS: Betsy/TJ
cooling line inspection
RF investigation: Dick and Marc
LVEA and CER access during Maintenance
SQZ: Nutsinee
access to HAM6 SQZ table, NEEDS LASER HAZARD
IO on PSL: Cheryl
non-invasive measurements
modification to camera 3 beam path, swap BS for HWP