TITLE: 01/08 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: None
SHIFT SUMMARY:
I covered this shift for Cheryl as she did IO PSL work during Maintenance today.
Today was a long Maintenance because of the MX Ion Pump work (which required gate valves be closed...and this is expected to go until/past 4pm).
Another notable item is the leak for TCSy chiller was discovered by TJ & Thomas (they are currently swapping out the chiller).
LOG:
- Contractors: Portapotty (16:05), Paradise 17:01, Unifirst (17:30)
- Guardian: IMC to OFFLINE, ISI CONFIG to SC_OFF_NOBRSXY, ISC_LOCK to DOWN, all SEI to OFFLINE, all SUS to SAFE
- 16:02-16:25 IM alignment (Cheryl)
- 16:04-16:17 Measurements around HAM2 (Bubba)
- 16:09-16:58 HEPI checks both end stations (Hugh)
- 16:18 MX ion pump work (Kyle, Chandra)
- 16:33-16:50 Work around racks (Richard)
- 16:35 PSL IO camera/other work (Cheryl)
- 16:42 SEI HAM3 work (Jim)
- 16:48 FSS electronics at ISCT6 (Ed)
- 16:50-17:40 EX als Power work (fil, richard) ----> ALS laser confirmed to be back ON (TJ)
- 17:30 PSL DBB work (Jason)
- 17:35 EX ground coupling to DARM (robert)
- Taking ISIs to OFFLINE, SUS to SAFE
- 17:47 EX run a grounding wire (fil, ed)
- 18:00 Bootfest begins! (dave, jonathan)
- 18:06 LN2 at CP2
- 18:12-18:17 ISCT6 work (Nutsinee)
- 18:16 Pulling fire hydrants--> alarms are being texted to site staff
- 18:25 TCSy checks (tj, thomas)
- 18:25 aip on ham7 (chandra)
- 18:45 snow starting!
- 19:39 external rf measurements at CER & PSL racks (dick, marc)
- 21:05 Heading out to do measurement
- 20:48 HAM6 work (Terry, Sheila)
- 20:55 TCSy chiller swap (Thomas.Thomas)
- 22:17 EY run a grounding wire (fil)
- 22:25 Measurements out in LVEA for platforms (Bubba)
- Handing off to Cheryl at 22:29pm