Ran through initial alignment in the morning. Could not get ALS DIFF to lock until Stefan found the setting that was out of nominal (alog 46335). 15:39 UTC Chris to mid X to retrieve tools 15:44 UTC Brian with Apollo through gate 16:18 UTC Peter to optics lab 19:34 UTC Peter back 20:18 UTC Robert to end X to switch ESD channel on voltage monitor 20:53 UTC Brian with Apollo through gate