Reports until 16:33, Friday 11 January 2019
LHO General
patrick.thomas@LIGO.ORG - posted 16:33, Friday 11 January 2019 (46377)
Ops Shift Summary
Prior to shift: Richard and Peter in PSL enclosure

15:56 UTC Karen to optics lab
16:02 UTC Vanessa to mid X
16:18 UTC Peter to optics lab. Karen to mid Y.
17:11 UTC Karen leaving mid Y
18:44 UTC Travis to optics lab, looking for gold mirrors for solder test
18:59 UTC Travis back
19:33 UTC Peter back
19:42 UTC Nutsinee to ISCT6

Lockloss, notification: 'PSL_FSS: PZT MON is high, may be oscillating'. Jason and Peter investigating.

20:38 UTC Nutsinee back
20:45 UTC Peter and Jason to PSL anteroom
20:52 UTC Peter and Jason back, turned off lights in PSL enclosure. Lights left on in PSL enclosure from this morning raised the temperature out of the FSS range. FSS needs to be locked manually until the temperature comes back to normal.
22:16 UTC Peter to optics lab
22:22 UTC Fire department to end X to check on RFAR
22:30 UTC Gerardo to Y2-8
Nutsinee to ISCT6
22:49 UTC Robert to end X to change measured voltage signal
23:34 UTC Peter back
23:39 UTC Gerardo back
23:55 UTC Robert back
00:08 UTC Nutsinee back