stefan.countryman@LIGO.ORG - posted 16:11, Tuesday 15 January 2019 (46442)
CNS II GPS Clock removal for firmware upgrade and FDS GPS antenna cable length measurement at EX and EY

Ana, Madox, Yasmeen, Stefan

We went to EX and EY to remove the CNS II Timing Diagnostic System GPS clocks and measure the GPS antenna cable lengths as part of work permit 8044. This will have NO IMPACT on anything outside of timing diagnostics.

EY

EY

We suspect that the cable connects to a cable in VEA after 90 ft which goes up to the roof. The total measured length at both end stations was about 210 ft;, however, this might be wrong if the cable to the roof has a different velocity factor than the LMR-195 going from VEA to the CNS II clock. Same for EX. We will go out tomorrow to EX to look at the cable type connecting from VEA to the rooftop GPS antenna and measure its length.