TITLE: 01/16 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY: new Guardian hardware installed the morning, useism increasing
LOG:
- 16-01-19 16:11 Vanessa to EX to clean
- 16-01-19 16:14 Karen to EX to drop stuff off then wants to go to the LVEA
- 16-01-19 16:39 Peter King to optics lab
- 16-01-19 16:41 Karen leaving EY
- 16-01-19 16:52 Vanessa done at EX heading to MX
- 16-01-19 17:00 Marc to LVEA to HAM6
- 16-01-19 17:10 Karen out of the LVEA
- 16-01-19 17:35 Nutsinee in EE Marc out of LVEA Terry here
- 16-01-19 18:26 Peter King done in optics lab
- 16-01-19 18:35 Nutsinee to HAM6
- 16-01-19 18:40 Terry to HAM6
- 16-01-19 22:00 Kyle back from MX
- 16-01-19 22:00 students to EY to look at a cable in the VEA
- 16-01-19 22:47 Nutsinee to ISCT6