HughR, MitchR, JimW
Today Team SEI pushed through most of the worst of the seismic optical table payload, but we ran into a couple of known issues. LLO found that these mass stacks somewhat interfere with the BS struts. But where Livingston only had to shift a few 1kg parts around, it looks like we have to move a 5kg mass. In the attached, somewhat cryptic, picture, the mass stack directly under the strut, and closest to the camera, is missing the interfering 5kg mass. We plan on shifting this mass to a neighboring stack, but that does mean the stacks will not be as uniform as on previous units.