LHO VE
kyle.ryan@LIGO.ORG - posted 16:19, Friday 09 November 2012 (4659)
Changes to LVEA purge air plumbing
Kyle, Gerardo 
Moved BSC1 purge air connection from dome to chamber to facilitate dome removal.  

Kyle 
Removed 4.5" CFF electrical feed-through from HAM6 D5-3 and preserved Class A for TBD re-installation.  Installed 4.5"-2.75" zero-length reducer and 1.5" all-metal angle valve (for future HAM6 purge) at D5-3.  