Reports until 19:45, Friday 09 November 2012
H1 IOO
cheryl.vorvick@LIGO.ORG - posted 19:45, Friday 09 November 2012 (4662)
IO sensing optics moved 2 inches to accomodate a possible shift in the PSL periscope.
Guido and I moved three optics in the IO sensing path, to make room for a possible shift in the PSL periscope.  Picture attached.
Images attached to this report