jason.oberling@LIGO.ORG - posted 15:00, Tuesday 13 November 2012 (4684)
BSC1 ITMy Cartridge Alignment
IAS: D. Cook, J. Oberling
 
We continued with the cartridge alignment today, finishing up the final tweaks.  The final CP alignment is:
This puts the CPy alignment within spec, so we then double checked the pitch/yaw of the ITMy to make sure our CPy tweaks did not disturb the previous ITMy alignments:
The ITMy pitch/yaw is still well within spec, so this completes IAS work on the BSC1 cartridge.  Doug then centered all the OSEMs, and we left the damping ON for both chains.