Reports until 15:30, Tuesday 13 November 2012
H1 INS
jodi.fauver@LIGO.ORG - posted 15:30, Tuesday 13 November 2012 (4686)
BSC1 Install Prep
A staging cleanroom was moved from the HAM1/2 area to BSC1/HAM3 area and then the central curtain partition was installed to create a garbing/staging cleanroom. Cris cleaned once the cleanroom was in place. Folks working in BSC1 (Lower Level) and in HAM3 should be able to garb and stage from this cleanroom.