Covering latter part of Jim's shift....
Commissioning Status: H1's ASC Loops were taking forever to converge. Gabriele is moving stuff around to help them converge & eventually went to NOMINAL_LOW_NOISE at 18:48.
- 18:25 Handed off from Jim
- 21:00 Stopping violin mode damping, she had mentioned doing this for a few hours prior (Kara)
- 21:27 (headed back out at 23:53) EX power supply noise & glitch hunting (Robert)
- After lunch: Gerardo was at all out-buildings to pick up VAC equipment.
- 21:46 MY vacuum work (Kyle)