Reports until 17:23, Tuesday 13 November 2012
H1 IOO
chris.mueller@LIGO.ORG - posted 17:23, Tuesday 13 November 2012 (4688)
Input Optics in the PSL
[Joe G., Luke W., Cheryl V., Chris M.]

Today we realigned the paths on the PSL table according to D0902114 with a few minor exceptions.  The first exception is that the ALS beam path was moved two inches closer to the reference cavity to give some more room between the EOM and ALS Faraday.  The second exception is that the optics which were moved to accommodate a possible periscope shift (alog 4662) were left in place even though the periscope was not shifted significantly.  

In addition the periscope was removed in order to fix the damping goo problem and put back in place.  

As of now the PSL is ready to inject a beam into the HAM 2 chamber for IMC flashing and alignment, which we expect to do tomorrow evening.