H1 AOS
thomas.vo@LIGO.ORG - posted 18:38, Tuesday 13 November 2012 (4689)
H1 ITMY Optical Lever Install
Apollo, Jax, Thomas

We completed the mechanical installation of the H1 ITMY Optical Lever, all of the components fit together as designed and the QPD currently reads back a signal into EPICS via these channels:

H1:SUS-QUADTST_L3_OPLEV_PIT_OUTMON
H1:SUS-QUADTST_L3_OPLEV_YAW_OUTMON
(with H2 ITMY calibration parameters but these are no longer valid, will re-run test for new parameters once the cartridge is installed, the optic damped, and the chamber pumped down)

These channels run into the test stand electronics in the LVEA at the moment but will soon be plugged into the permanent H1 OptLev channel in the H1 electronics bay, cables to be ran. 

Next we have to align, measure the waist and calibrate the signal.