TITLE: 02/12 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: None
SHIFT SUMMARY:
Today was a full Maintenance Day with LHO Site opening up after being closed for last 3-days due to snow. Notable items:
- X-Arm is CLOSED! (and blocked with a vehicle. This arm as not been plowed yet.)
- PSL CHILLER WORK CONTINUES: PSL Chiller work is running long due to leak which was taking longer to address than expected (as of 3:30, heard it was going to be on the order of hours....or days?).
- Y-arm Gate Vaves CLOSED: MY Ion Pump is currently being craned into place. Next up will be opening Y-arm gate valves at MY.
LOG:
- Snow plowing in the morning as well as prep work for MY ion pump work.
- 18:54 TCSy CO2 alignment work (Danny & TJ)
- 19:33 Several SEI & SUS systems tripped....corresponding with loud bang heard from Control Room...suspecting this is from a big chunk of ice crashing nearby.
- 19:35 Magnetometer installation in/near CER at the Diode Room (Robert, Kara)
- 19:40 CDS crash of several front ends (noticed this as I was recovering from SEI/SUS trips. Dave contacted.
- 20:21-23:00 ISCT6 work (Nutsinee)
- 20:50 ETMx & y Charge Measurements (Corey)
- 21:55 - 22:55 EX install new illuminator chassis and work on HV power supply (Fil & Marc)
- White SUV is stuck midway between LVEA & MX.
- BS Guardian transition investigation by Jenne
- 0:02 Installing shakers (Robert, Kara)