Displaying report 1-1 of 1.
Reports until 20:26, Saturday 16 February 2019
H1 PEM (DetChar)
robert.schofield@LIGO.ORG - posted 20:26, Saturday 16 February 2019 - last comment - 12:30, Tuesday 26 February 2019(46971)
Magnetometers set up to search for possible new big glitch source

A plot of inspiral range hour-trends supports the impression that the rate of major glitches is, at present, greater than in O1 or O2 at LHO and possibly LLO as well. The minimum range per hour in Figure 1 (blue) appears lower now than in O1 and O2 (and the associated commissioning time) because fewer hours are free of major range drops. The plot on the second page of Figure 1 compares single recent days around the supernova alert, when the interferometers were mostly left free of commissioning glitches, to random days in O2, and these plots also suggest a higher big glitch rate at both sites. Hopefully, the high glitch rate will go away once the interferometers are in run mode, but I think we should start worrying, just in case.

One possibility is that the apparent increase in glitch rate is due to a new piece of equipment such as electronic or computer equipment, that was installed at each site during the O1-O2 break. Sheila pointed out that the possibilities might be narrowed down at LLO since the installation was staggered. I looked for a step increase, and, while it is not completely clear,  the best candidate appeared to be the March – September 2018 down-time (Figure 2). Suggestions of equipment to investigate would be appreciated.

I, and as far as I know, others, have not found channels that predict the majority of the major glitches. So, Kara and I set up magnetometer channels to monitor new equipment that might be too far from the permanent magnetometers for glitch source identification.

Robert, Kara

 

H1:PEM-EX_ADC_0_13_2K_OUT_DQ 

EX HV ESD power supply, gain 1

H1:PEM-CS_ADC_5_20_2K_OUT_DQ

Diode room 70W box, gain 100

H1:PEM-CS_ADC_5_21_2K_OUT_DQ

Diode room 70W box, gain 1

H1:PEM-CS_ADC_5_22_2K_OUT_DQ

Diode room 70W box, gain 1

H1:PEM-CS_ADC_5_23_2K_OUT_DQ

Squeezer rack, gain 100

H1:PEM-CS_ADC_5_24_2K_OUT_DQ

Squeezer rack, gain 1

H1:PEM-CS_ADC_5_25_2K_OUT_DQ

Squeezer rack, gain 1

Non-image files attached to this report
Comments related to this report
kara.merfeld@LIGO.ORG - 12:30, Tuesday 26 February 2019 (47129)PEM
There are so far no obvious correlations between the magnetometer signals and the glitches.  We will continue to analyze the lock segments that we have using different methods, but to broaden our search I have moved the 3rd magnetometer from the squeezer rack to next to the TTFSS on top of the table at Nutsinee's suggestion.
Displaying report 1-1 of 1.