In preparation for the H1 PSL run tonight, we powered up the VME epics IOC rack (h1psl), the beckhoff controller box in the LVEA and the ethercat-OPC-EPICS system (h1pslopc). all IOCs were burt restored back to early Sep 2010. Epics records are resolving and green, but show zeros at the moment (needs more boxes to be powered up in the diode room?).