TITLE: 02/22 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
Wind: 5mph Gusts, 2mph 5min avg
Primary useism: 0.05 μm/s
Secondary useism: 0.29 μm/s
QUICK SUMMARY:
Foggy drive in before 8am.
EQ recovery was not that bad according to Jenne (no SUS tripped and SEI were in an EQ state). FSS work by Peter started at 13:10utc, and during this Jenne performed some dark measurements. Oh, and this H1 downtime allowed Bubba to clear EY to allow first access to EY since snowmageddon. Jenne ran an initial alignment. Locking H1 now.