TITLE: 02/22 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY:
Had a 6-hr lock for good chunk of the shift, then dropped out which allowed for an LSC model/daq restart (+restart of HAM6 dust monitor). Now commissioning continues (some 2nd harmonic violin mode going on by Kara & Jenne + other work).
LOG:
- 13:10-15:30 FSS work
- EQ Recovery, Dark measurement & Initial Alignment by Jenne
- 15:30-16:30 EY/Yarm/CP1 plowing.
- 16:34 CDS Login work--only affecting remote work (Carlos)
- 17:31-17:41 ISCT6 work (Nutsinee)
- 18:22 - 18:32 PSL Laser Beckhoff died & came back on its own (Dave noticed and notified Peter & I).
- 18:45-18:55 Tour in Control Room (Amber, Stevie)
- 18:58-21:29 Delivery of VAC equipment to MY in multiple trips (Kyle)