The IR beam was successfully aligned from the PSL to HAM2, through the IO periscope, off 2 steering mirrors, and through MC1 to HAM3. In HAM3, we discovered that MC2 has FC, which precludes bouncing a beam back to HAM2. We aligned the beam to MC2, explored some options for continuing to work, and then called it for tonight.