Reports until 17:03, Friday 16 November 2012
LHO General
patrick.thomas@LIGO.ORG - posted 17:03, Friday 16 November 2012 (4717)
Ops Summary
Unifirst arrived with floor mats.
A viewport was installed in the septum between HAM 1 and 2.
Michael R. transitioned the LVEA to laser hazard for MC locking work.
Michael R. transitioned the LVEA to laser safe.
Richard and Dave added the ion pump on BSC6 to the control system.
Michael R. and Alberto worked on aligning the PSL ALS optics.
Dale lead a tour through the control room.