On Tuesday, Corey and I went through the laborious task of checking and charging as needed the 50 accumulators on H1.
We found a dozen or so that could use a top up but just a few of those were quite low. One needed a schrader valve replaced.
After this and bleeding air from the resistors, we set the trip level of the reservoir. WP 8099 closed.