TITLE: 02/28 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY: Commissioning work all day. Had to do an initial alignment on the last lock after we would lose lock at DHARD_WFS twice in a row.
LOG:
1600 Pfeifer crew and Kyle at MY
1625 Karen to MY
1741 Karen leaving MY
1835 Danny and Dan to LVEA SRM heater testing (WP#8052)
1847 Chandra, Kyle to MY to start some testing. Should not affect IFO.
1915 Danny and Dan out
1926 Nutsinee to LVEA to turn off equipment near SQZT6
1932 Nutsinee out
2130 Rich A to LVEA OMC rack
2134 Jenne to LVEA to adjust on ISCT1
21414 Dan, Sheila to LVEA to place black glass in OMC Trans camera
2200 Nutsinee to LVEA ISCT6 area
2213 Dan, Sheila out
2230 Jenne out
2232 Nutsinee out
2307 Rich A, Fil out
2310 Nutsinee out
2314 Rich A, Fil to LVEA to HAM6 racks