TITLE: 03/05 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY:
Maintenance roughly ended just after noon. There was single bounce work for Squeezer in the afternoon.
Initial Alignment Notes: Then an Initial Alignment was run---ALS X-arm was pretty misaligned, but Patrick was able to restore it after some aggressive slider moves (and had to wait quite a bit for ASC signals to converge before offloading). SRC was fairly misaligned and this required tweaking SR2 pointing on the AS_C PD. Once this was centered, Patrick was able to lock the SRC.
Locking Note: IR was not found. Diff Offset slider was moved to maximize TR-X_NORM (blue on StripTool), but it only made it to about 0.45. Georgia suggested we get this value to 1.0 by taking the TRX_QPD_B_SUM's offset from -1.2 to 1.0. This did the trick. The offset was returned to -1.2.
LOG:
- Contractors: Pest Control (w/ Chris), gardeners, toilets, paradise water
- 13:10 PSL work (Peter & Rick)
- 16:05-18:05 EX PCal Measurement (niko.kara.sharan)
- 16:15-17:31 EY & EX HEPI level check + Dust Monitor Pump check (Hugh, Jeff B)
- 16:26 SR3 oplev laser swap (Jason)
- ~16:40 Jason going to PSL afterward for
- 16:27 EY booster pump work (kyle)
- Not completed
- valving out the
- 16:29....IMC locked & ISC guardian tried going to NLN! (talked to PSL & PCal groups and they didn't do it, so taking IMC to DOWN!)
- Took IMC to MANUAL--->OFFLINE
- Pausing ISC_LOCK appeared to do the trick.
- 16:40 EX ESD Power Suppy isolating (Richard, Fil, later joined by Ed, Rich)
- 16:53 Checking SEI guardian changes from last week....will be mindful to not interfere EX PCal work (Jim)
- 17:32-18:59 EY HWS Troubleshooting (Danny, Dan)
- 17:36 Heading to LVEA for parts (Gerardo)
- 17:39-17:49 Amber tour in control room
- 17:39 EX CP8 LN2 delivery
- 17:41 LVEA CP1 LN2 delivery
- 17:54 3IFO checks in LVEA (Bubba)
- 17:54 FAMIS tasks in LVEA (Chris)
- 18:14 Moving parts in lvea (jim, betsy)
- 18:18-18:38 EY Pcal Alignment check (niko)
- 18:36 DAQ/GDS work beginning (Dave, Jonathan, Greg)
- 19:30 HWS x Temp sensors (TJ)
- 20:08 EX Beckhoff restart
- 20:08 PSL crew done
- 20:13 Single Bounce measurements (Sheila, Nutsinee)
- 22:33-23:17 Gerardo to HAM1
- 22:37 Sqz work (sheila, nutsinee)
- Late afternoon: Swapping GPS clocks at End stations (Dave)