Reports until 17:28, Tuesday 05 March 2019
LHO General
corey.gray@LIGO.ORG - posted 17:28, Tuesday 05 March 2019 (47288)
DAY Operator Summary

TITLE: 03/05 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY:

Maintenance roughly ended just after noon.  There was single bounce work for Squeezer in the afternoon. 
Initial Alignment Notes:  Then an Initial Alignment was run---ALS X-arm was pretty misaligned, but Patrick was able to restore it after some aggressive slider moves (and had to wait quite a bit for ASC signals to converge before offloading).  SRC was fairly misaligned and this required tweaking SR2 pointing on the AS_C PD.  Once this was centered, Patrick was able to lock the SRC.

Locking Note:  IR was not found.  Diff Offset slider was moved to maximize TR-X_NORM (blue on StripTool), but it only made it to about 0.45.  Georgia suggested we get this value to 1.0 by taking the TRX_QPD_B_SUM's offset from -1.2 to 1.0.  This did the trick.  The offset was returned to -1.2.
LOG: