TITLE: 03/06 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY:
Rode through a few EQs during today's shift.
LOG:
- Alignment Work In Morning: Arrived to see the ALSy with no light, so started investigating (Ed, Jeff, and I tag teamed this). Ed was able to get us a beam on the camera, and I then steered the BS in yaw (as Jenne pointed to the ASAIR yaw which was visible). After alignment, took H1 to Nominal Low Noise.
- 16:07-16:27 EY to Chiller yard (Bubba)
- 16:20-16:42 Junction box for RFPD (WP#8114)(Richard)
- 19:47-21:30 SRM Heater work begins (Danny & Dan)
- 19:50 At Nominal Low Noise
- Violin Modes [ETMx,/M9, and ITMx/M1were a little rung up, so focused on them a bit (Rahul & I). Ed is working on the 2nd harmonic.]
- 21:06 Lockloss most likely due to a New Zealand EQ rolling through.
- 23:30 PSL Chiller topped Off. (corey)