Reports until 09:15, Thursday 07 March 2019
H1 CAL
madeline.wade@LIGO.ORG - posted 09:15, Thursday 07 March 2019 (47361)
GDS calibration pipeline configuration updated - fix to injection bits in GDS-CALIB_STATE_VECTOR

M. Wade

We found a problem with the configuration for setting the injection bits in the GDS-CALIB_STATE_VECTOR.  The configuration bug crept in on Feb. 26 and the configurations were correct before this time.  I fixed the configurations and restarted the pipeline around GPS time 1236011968.  The new configuration file is in the calibration SVN under

aligocalibration/trunk/Runs/ER14/GDSFilters/H1GDS_1236011968.ini

The difference in this configuration file and the last one is the CBC, Burst, DetChar, and Stochastic HW injection bitmasks are now configured to look for bits 9, 17, 33, and 65, respectively, to be OFF in CAL-INJ_STATUS_OUT_DQ instead of ON.

Since the restart, the GDS-CALIB_STATE_VECTOR is now correctly reporting that HW injections are OFF.