TITLE: 03/08 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
Wind: 7mph Gusts, 5mph 5min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.16 μm/s
QUICK SUMMARY:
IFO unlocked. EQ around Phillippines hindering a bit. Jeff B recovered Green arm align and was waiting on DRMI. SRC (SR2) was found a bit off. It was corrected amd normal locking was resumed. We are currently at DC readout + 30W. Jeff B was in LVEA shooting the ITMs and Jenne is taking measurements.