Displaying report 1-1 of 1.
Reports until 11:22, Friday 08 March 2019
LHO General
kyle.ryan@LIGO.ORG - posted 11:22, Friday 08 March 2019 (47398)
De-energized HEPI DC pwr supply at Y-end (unintentionally)

(see WP #8111)

I accidentally blew a fuse within the HEPI panel this morning by plugging a drill into a power strip which was being powered by the HEPI panel.  Jim W. and Fil C. responded.  The fuse wasn't serviceable at the time so the affected power supply was plugged into an extension cord as an interim solution.

Displaying report 1-1 of 1.