TITLE: 03/11 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY: Most of the day after lockloss spent damping violin modes and tuning filters.
LOG:
16:35 Keita to LVEA ISS 2nd loop measurement while H1 is out of lock
16:51 Keita done
21:25 Dave to both ends looking at chassis to be replaced tomorrow
21:53 Nutsinee to SQZ rack
21:54 Dave at MY