H1 General
travis.sadecki@LIGO.ORG - posted 16:00, Monday 11 March 2019 (47439)
Ops Day Shift Summary

TITLE: 03/11 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY:  Most of the day after lockloss spent damping violin modes and tuning filters.
LOG:

16:35 Keita to LVEA ISS 2nd loop measurement while H1 is out of lock

16:51 Keita done

21:25 Dave to both ends looking at chassis to be replaced tomorrow

21:53 Nutsinee to SQZ rack

21:54 Dave at MY