TITLE: 03/21 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Locking
INCOMING OPERATOR: Travis
SHIFT SUMMARY: IR comm was difficult, comm offset needed to be set by hand, DRMI ASC was also a constant problem
LOG:
17:00 Robert to CER
17:00 Lockloss because someone did something in ASC
17:30 Lockloss
18:00 Lockloss
18:20 Lockloss, to initial alignment
20:15 Lockloss, follow by long period struggling with IR comm and DRMI asc
21:48 Lockloss
Shift was a bit rough - spent 11am to 4pm on relocking/alignment with Jenne and Sheila. Back into locking, Anamaria and the Robert crew jumped on PEM injections.