Reports until 15:58, Thursday 21 March 2019
H1 General
jim.warner@LIGO.ORG - posted 15:58, Thursday 21 March 2019 - last comment - 16:38, Thursday 21 March 2019(47746)
Shift Summary

TITLE: 03/21 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Locking
INCOMING OPERATOR: Travis
SHIFT SUMMARY: IR comm was difficult, comm offset needed to be set by hand, DRMI ASC was also a constant problem

LOG:

17:00 Robert to CER

17:00 Lockloss because someone did something in ASC

17:30 Lockloss

18:00 Lockloss

18:20 Lockloss, to initial alignment

20:15 Lockloss, follow by long period struggling with IR comm and DRMI asc

21:48 Lockloss

 

 

 

 

 

Comments related to this report
betsy.weaver@LIGO.ORG - 16:38, Thursday 21 March 2019 (47749)

Shift was a bit rough - spent 11am to 4pm on relocking/alignment with Jenne and Sheila.  Back into locking, Anamaria and the Robert crew jumped on PEM injections.