Reports until 08:08, Monday 25 March 2019
H1 General
jeffrey.bartlett@LIGO.ORG - posted 08:08, Monday 25 March 2019 (47840)
Ops Owl Shift Summary

Ops Shift Log: 03/25/2019, Owl Shift 07:00 – 15:00 (00:00 - 08:00) Time - UTC (PT)

State of H1: Locked at NLN, 35.2w and 106.8Mpc
Intent Bit: Observing
Support: N/A
Incoming Operator: Cheryl
Shift Summary: First half of shift was spent in Observation mode. The latter part of the second half of the shift was spent trying to damping Violin Mode-9. Guarding appears to have control of the gain as my input is immediately zeroed out. Mode-9 is still ringing up and I am unable to damp it.  
 
Activity Log: Time - UTC (PT)
07:00 (00:00) Start of Shift
12:55 (05:55) Out of Observing to damp violin mode-9
13:41 (06:41) Back to Observing – while trying to damp violin mode-9
15:00 (08:00) Turning over to Cheryl