Ops Shift Transition: 03/26/2019, Owl Shift 07:00 – 15:00 (00:00 -08:00) - UTC (PT)
State of H1: Relocking
Intent Bit: Commissioning
Weather: Skies are a bit overcast. The wind is ranging between 20mph along the X-Arm, to 3mph at End-Y. Temperatures are in the upper 40s to lower 50s
Primary 0.03 – 0.1Hz: X & Y axis is at 0.06um/s and Z axis is 0.9um/s
Secondary 0.1 – 0.3Hz: 0.8mu/s
Outgoing Operator: Patrick
Summary: Relocking the IFO after commissioning lockloss.