WIth IO still working out some yaw issues before I am needed for another round of pitch adjustment, I was free to resume work on the BS suspension on the BSC 2 cartridge. After refreshing my memory via Hugh, I locked down the ISI. The first round of lockers (Stage 2 lockers??) worked flawlessly. However, moving to the second round, I was only able to get 2 of the 3 lockers fully engaged. I wasn't using isopropanol as is standard practice within SEI, but determined by nudging the ISI that is was locked sufficiently to allow me to do what I had intended. I began work on the BS by removing the ECD magnet block and replacing them with the dummy Al blocks. This required reweighting the top mass as these block were also a COM correction in addition to eliminating magnets. I reweighed and redistributed the masses to the nominal (symmetrical) arrangement. I then resuspended the chain and confirmed that the new arrangement produced a favorable alignment of the chain i.e. no gross pitch. Next up: replace the BOSEMs that I removed to facilitate ECD block replacement, and finish cabling for the first round of re-testing. Cartridge status: ISI is locked, SUS is hanging.