Ops Shift Log: 03/26/2019, Owl Shift 07:00 – 15:00 (00:00 - 08:00) Time - UTC (PT)
State of H1: Unlocked
Intent Bit: Preventive Maintenance
Support: N/A
Incoming Operator: Niko
Shift Summary: Back to NLN. Craig & Georgia doing frequency noise injections. After finishing injections, and clearing a couple of SDF diffs, went back into Observing.
Earthquake lockloss – One maybe two back to back 5.6 in El Salvador. Took SEI_CONFIG to EARTH_QUAKE state as the microseism was pushing above 0.9um/s. Microseism was rising very quickly, and peeked at a little over 1.0um/s. The IFO broke lock just after selecting the state. Microseism is dropping just as quickly as it rose. Trying to relock.
When microseism was back under 0.08um/s, switched back to WENDY state.
Relocked at NLN, 35.2w, 104.4Mpc range, and back into Observing Mode. Lockloss - ASC saturation.
Reset Ring Heaters Filter input back to ITM-X to 0.5w and ITM-Y to 1.4w.
Relocked the IFO at NLN and went to Observing. Was in Observing for less than 30 seconds when lock broke due to LSC Servo Board Split Voltage is High. This was a problem earlier in the shift. Put the IFO into down ahead of the maintenance window.
Activity Log: Time - UTC (PT)
07:00 (00:00) Take over from Patrick
08:05 (01:05) Back to NLN
08:20 (01:20) Commissioners running frequency noise injections
08:30 (01:30) Commissioners finished with injections
08:34 (01:34) Back to Observing
12:32 (05:32) Lockloss – Earthquake
13:40 (06:40) Locked at NLN
13:42 (06:42) Back to Observing
13:47 (06:47) Lockloss – Ring heater Filter Input
14:19 (07:19) Relocked at NLN
14:24 (07:24) Back into Observe
14:24 (07:24) Lockloss – LSC Servo Board Split Voltage is High
14:25 (07:25) Put IFO into Down state ahead of maintenance window
14:51 (07:51) Karen – Going to End-Y
14:59 (07:59) Carols – Taking down DMT and FMC EPICS
15:00 (08:00) Turn over to Niko