Reports until 16:04, Tuesday 26 March 2019
H1 General
yannick.lecoeuche@LIGO.ORG - posted 16:04, Tuesday 26 March 2019 (47902)
Shift Summary - Day

TITLE: 03/26 Day Shift: 15:00 - 23:00 UTC (8:00 - 16:00 PST), all times posted in UTC

STATE of H1: Commissioning

INCOMING OPERATOR: Patrick

SHIFT SUMMARY: Maintenance from 8am -12:30 pm. Initial alignment went smoothly, then an LSC servo board splitmon-induced lockloss gave us trouble getting past ACQUIRE_DRMI_1F. Hit NLN around 3:30pm, leaving still locked with Cal measurements ongoing.

LOG:

15:00 (8:00) Start of shift

15:08 (8:08) Vanessa to EX

15:11 (8:11) Hugh to LVEA -- look at seismic shorts

15:13 (8:13) Richard to LVEA -- add remote controlled relay to VCO power

15:18 (8:18) Bubba to LVEA -- look at things for O3

15:19 (8:19) Phillipe to LVEA -- grab equipment

15:28 (8:28) Bubba out of LVEA

15:50 (8:50) Hugh out of LVEA

15:53 (8:53) TJ to LVEA -- HWS temperature sensor install

15:53 (8:53) Nutsinee to LVEA -- replace ISCT6 diode

15:58 (8:58) Hugh to EX, EY -- HEPI fluid check, look for seismic shorts

16:23 (9:23) Dave to EY -- network switch work

16:31 (9:31) Karen leaving EY

16:39 (9:39) Hugh done with end station work

16:59 (9:59) Vanessa, Karen to LVEA

NOTE: Karen said her key fob wouldn’t work while trying to get into EY

17:02 (10:02) Chandra to LVEA -- take photos of HAM6

17:09 (10:09) Ed to EY, Fil to EX -- grab VCO’s

17:10 (10:10) Betsy, Jim to LVEA -- fit checking C3 cover

17:14 (10:14) Carlos restarting H1 video cameras

17:18 (10:18) TJ out of LVEA

17:25 (10:25) Christina to EX, EY -- collect Norco reciepts

17:33 (10:33) Chris to EX, EY

17:35 (10:35) Dick to LVEA -- trace noise

17:38 (10:38) Betsy, Jim out of LVEA

17:39 (10:39) Chandra out of LVEA (mentioned she crawled on HAM6)

17:42 (10:42) Corey to EX, EY -- ALS table pictures

17:58 (10:58) Corey transitioning EY to LASER HAZARD

17:58 (10:58) Paradise water at gate

18:01 (11:01) Phillipe, Sharan to EY -- grab speaker

18:25 (11:25) Chris back from End Stations

18:42 (11:42) Betsy, Rahul to LVEA

18:55 (11:55) Betsy, Rahul out of LVEA

19:02 (12:02) Nutsinee out of LVEA

19:10 (12:10) Dick out of LVEA

19:10 (12:10) Ed back from EY

19:12 (12:12) Fil, Corey back from EX

19:15 (12:15) Richard to CER -- “look at some stuff”

19:43 (12:43) Starting initial alignment

20:32 (13:32) Kyle to MY

20:34 (13:34) Nutsinee to ISCT6

20:39 (13:39) Carlos to CER

20:47 (13:47) Carlos out of CER

20:53 (13:53) Lockloss from DRMI_TO_POP - LSC Servo Board Splitmon Voltage High

21:22 (14:22) Christina to MX -- grabbing Norco receipt

21:43 (14:43) Lockloss from ACQUIRE_DRMI_1F - IMC Servo Board Splitmon Voltage High

21:54 (14:54) Kyle back from MY

23:00 (15:00) End of shift