Reports until 17:20, Tuesday 26 March 2019
LHO VE
kyle.ryan@LIGO.ORG - posted 17:20, Tuesday 26 March 2019 (47910)
Cleaned out Try-Cock piping on site LN2 dewars

Some of the liquid nitrogen dewar Try-Cock exhaust-to-atmosphere tubes were blocked or, partially blocked, with mud dauber wasp nests (a.k.a "mud') -> So, today I cleaned out each one via opening the Try-Cock valve and then feeding a wire up through the exhaust tube so as to dislodge the obstruction.  Once dislodged, the ~10 psig GN2 vapor blew the debris out onto the ground.  .